Sawtooth Solar
Eloy, Arizona
- Capacity
- 500 MW
- Status
- Under construction
- Fuel
- Battery storage
- Technology
- Batteries
- Operator
- EDF Renewables Development, Inc.
- City
- Eloy
- County
- Pinal County
- State
- Arizona
- Expected online
- June 2028
- Balancing authority
- AZPS
Sawtooth Solar is a 500 MW battery storage power plant in Eloy, Arizona. Operated by EDF Renewables Development, Inc., it is under construction with an expected online date of June 2028. The facility is located in Pinal County, within the AZPS balancing authority.
Loading map…
Nearby battery storage plants in Arizona
CO Bar Solar and BESS
Battery storage · Flagstaff, Arizona · Planned
CO Bar D Solar and BESS
Battery storage · Flagstaff, Arizona · Planned
THREE SISTERS Solar Generation and BESS
Battery storage · Manzoro, Arizona · Under construction
Harquahala 2
Battery storage · Tonopah, Arizona · Operating
Desert Sand BESS
Battery storage · Tonopah, Arizona · Under construction
Source: U.S. Energy Information Administration (EIA-860M)