Roadrunner Reserve Phase 2
Tucson, Arizona
- Capacity
- 200 MW
- Status
- Under construction
- Fuel
- Battery storage
- Technology
- Batteries
- Operator
- Tucson Electric Power Co
- City
- Tucson
- County
- Pima County
- State
- Arizona
- Expected online
- May 2026
- Balancing authority
- TEPC
Roadrunner Reserve Phase 2 is a 200 MW battery storage power plant in Tucson, Arizona. Operated by Tucson Electric Power Co, it is under construction with an expected online date of May 2026. The facility is located in Pima County, within the TEPC balancing authority.
Loading map…
Nearby battery storage plants in Arizona
CO Bar Solar and BESS
Battery storage · Flagstaff, Arizona · Planned
CO Bar D Solar and BESS
Battery storage · Flagstaff, Arizona · Planned
THREE SISTERS Solar Generation and BESS
Battery storage · Manzoro, Arizona · Under construction
Harquahala 2
Battery storage · Tonopah, Arizona · Operating
Desert Sand BESS
Battery storage · Tonopah, Arizona · Under construction
Source: U.S. Energy Information Administration (EIA-860M)