Solar Carver 1 Hybrid
Carver, Massachusetts
- Capacity
- 4 MW
- Status
- Under construction
- Fuel
- Battery storage
- Technology
- Batteries
- Operator
- Solar Carver 1, LLC
- City
- Carver
- County
- Plymouth County
- State
- Massachusetts
- Expected online
- July 2026
- Balancing authority
- ISNE
Solar Carver 1 Hybrid is a 4 MW battery storage power plant in Carver, Massachusetts. Operated by Solar Carver 1, LLC, it is under construction with an expected online date of July 2026. The facility is located in Plymouth County, within the ISNE balancing authority.
Loading map…
Nearby battery storage plants in Massachusetts
Medway Grid
Battery storage · Massachusetts · Operating
Energizar BESS
Battery storage · Massachusetts · Under construction
Taft BESS
Battery storage · Massachusetts · Under construction
Salt Cod BESS
Battery storage · Massachusetts · Under construction
Cranberry Point Energy Storage
Battery storage · Carver, Massachusetts · Operating
Source: U.S. Energy Information Administration (EIA-860M)