401 South
Dalton, Massachusetts
- Capacity
- 1.5 MW
- Status
- Operating
- Fuel
- Battery storage
- Technology
- Batteries
- Operator
- Madison Energy Investments LLC
- City
- Dalton
- County
- Berkshire County
- State
- Massachusetts
- Operational date
- December 2023
- Balancing authority
- SOCO
401 South is a 1.5 MW battery storage power plant in Dalton, Massachusetts. Operated by Madison Energy Investments LLC, it has been operating since 2023. The facility is located in Berkshire County, within the SOCO balancing authority.
Loading map…
Nearby battery storage plants in Massachusetts
Medway Grid
Battery storage · Massachusetts · Operating
Energizar BESS
Battery storage · Massachusetts · Under construction
Taft BESS
Battery storage · Massachusetts · Under construction
Salt Cod BESS
Battery storage · Massachusetts · Under construction
Cranberry Point Energy Storage
Battery storage · Carver, Massachusetts · Operating
Source: U.S. Energy Information Administration (EIA-860M)