Galena 2 Geothermal Power Plant

Reno, Nevada

Capacity
16.5 MW
Status
Operating
Fuel
Geothermal
Technology
Geothermal
Operator
Ormat Nevada Inc
City
Reno
County
Washoe County
State
Nevada
Operational date
April 2007
Balancing authority
NEVP

Galena 2 Geothermal Power Plant is a 16.5 MW geothermal power plant in Reno, Nevada. Operated by Ormat Nevada Inc, it has been operating since 2007. The facility is located in Washoe County, within the NEVP balancing authority.

Loading map…

Nearby geothermal plants in Nevada

Source: U.S. Energy Information Administration (EIA-860M)