H Neely Henry Dam
Ohatchee, Alabama
- Capacity
- 72.9 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- Alabama Power Co
- City
- Ohatchee
- County
- Calhoun County
- State
- Alabama
- Operational date
- June 1966
- Balancing authority
- SOCO
H Neely Henry Dam is a 72.9 MW hydroelectric power plant in Ohatchee, Alabama. Operated by Alabama Power Co, it has been operating since 1966. The facility is located in Calhoun County, within the SOCO balancing authority.
Loading map…
Nearby hydroelectric plants in Alabama
Wilson Dam
Hydroelectric · Muscle Shoals, Alabama · Operating
Wheeler Dam
Hydroelectric · Town Creek, Alabama · Operating
Walter Bouldin Dam
Hydroelectric · Wetumpka, Alabama · Operating
Martin Dam
Hydroelectric · Dadeville, Alabama · Operating
Lewis Smith Dam
Hydroelectric · Jasper, Alabama · Operating
Source: U.S. Energy Information Administration (EIA-860M)