Oak Leaf - CSG Portfolio (OL 38)
Watkins, Colorado
- Capacity
- 1.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Distributed Solar Development, LLC
- City
- Watkins
- County
- Adams County
- State
- Colorado
- Operational date
- June 2021
- Balancing authority
- SWPP
Oak Leaf - CSG Portfolio (OL 38) is a 1.5 MW solar power plant in Watkins, Colorado. Operated by Distributed Solar Development, LLC, it has been operating since 2021. The facility is located in Adams County, within the SWPP balancing authority.
Loading map…
Nearby solar plants in Colorado
Rocky Mountain Solar
Solar · Colorado · Operating
Neptune Energy Center Hybrid
Solar · Boone, Colorado · Operating
Fortress 1
Solar · Colorado · Under construction
Thunder Wolf Energy Center Hybrid
Solar · Avondale, Colorado · Operating
Arroyo Solar
Solar · Avondale, Colorado · Under construction
Source: U.S. Energy Information Administration (EIA-860M)