Grand Valley Solar Generation and BESS
TBD, Colorado
- Capacity
- 200 MW
- Status
- Under construction
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- GRVA bn, LLC
- City
- TBD
- County
- Mesa County
- State
- Colorado
- Expected online
- October 2029
- Balancing authority
- PSCO
Grand Valley Solar Generation and BESS is a 200 MW solar power plant in TBD, Colorado. Operated by GRVA bn, LLC, it is under construction with an expected online date of October 2029. The facility is located in Mesa County, within the PSCO balancing authority.
Loading map…
Nearby solar plants in Colorado
Rocky Mountain Solar
Solar · Colorado · Operating
Neptune Energy Center Hybrid
Solar · Boone, Colorado · Operating
Fortress 1
Solar · Colorado · Under construction
Thunder Wolf Energy Center Hybrid
Solar · Avondale, Colorado · Operating
Arroyo Solar
Solar · Avondale, Colorado · Under construction
Source: U.S. Energy Information Administration (EIA-860M)