CUA West Campus - North (CSG)
Washington, District of Columbia
- Capacity
- 3 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Standard Solar
- City
- Washington
- County
- District of Columbia County
- State
- District of Columbia
- Operational date
- June 2024
- Balancing authority
- PJM
CUA West Campus - North (CSG) is a 3 MW solar power plant in Washington, District of Columbia. Operated by Standard Solar, it has been operating since 2024. The facility is located in District of Columbia County, within the PJM balancing authority.
Loading map…
Nearby solar plants in District of Columbia
JBAB - Washington DC
Solar · Washington, District of Columbia · Operating
V Street Solar
Solar · District of Columbia · Operating
DC Water Solar
Solar · Washington, District of Columbia · Operating
CUA West Campus - South (CSG)
Solar · Washington, District of Columbia · Operating
Oxon Run CREF
Solar · Washington, District of Columbia · Operating
Source: U.S. Energy Information Administration (EIA-860M)