Lakeland Electric Co. (FL) - Airport II
Lakeland, Florida
- Capacity
- 3.5 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Sun E N7 Holdings LLC
- City
- Lakeland
- County
- Polk County
- State
- Florida
- Operational date
- September 2012
- Balancing authority
- TEC
Lakeland Electric Co. (FL) - Airport II is a 3.5 MW solar power plant in Lakeland, Florida. Operated by Sun E N7 Holdings LLC, it has been operating since 2012. The facility is located in Polk County, within the TEC balancing authority.
Loading map…
Nearby solar plants in Florida
Tenmile Creek
Solar · TBD, Florida · Operating
Blackwater River Solar Energy Center
Solar · Milton, Florida · Operating
FPL Shirer Branch Solar Energy Center
Solar · Clarksville, Florida · Operating
FPL Chipola River Solar Energy Center
Solar · Altha, Florida · Operating
Canoe
Solar · Holt, Florida · Operating
Source: U.S. Energy Information Administration (EIA-860M)