ZPD-PT Solar Project 2017-023 LLC Hybrid

Southbridge, Massachusetts

Capacity
4.7 MW
Status
Operating
Fuel
Solar
Technology
Solar Photovoltaic
Operator
AES Distributed Energy
City
Southbridge
County
Worcester County
State
Massachusetts
Operational date
January 2021
Balancing authority
ISNE

ZPD-PT Solar Project 2017-023 LLC Hybrid is a 4.7 MW solar power plant in Southbridge, Massachusetts. Operated by AES Distributed Energy, it has been operating since 2021. The facility is located in Worcester County, within the ISNE balancing authority.

Loading map…

Nearby solar plants in Massachusetts

Source: U.S. Energy Information Administration (EIA-860M)