Greenstone Solar, LLC
Coldwater, Michigan
- Capacity
- 20 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Greenstone Solar, LLC
- City
- Coldwater
- County
- Branch County
- State
- Michigan
- Operational date
- October 2023
- Balancing authority
- MISO
Greenstone Solar, LLC is a 20 MW solar power plant in Coldwater, Michigan. Operated by Greenstone Solar, LLC, it has been operating since 2023. The facility is located in Branch County, within the MISO balancing authority.