Ft. Churchill PV
Yerington, Nevada
- Capacity
- 19.9 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Sierra Pacific Power Co
- City
- Yerington
- County
- Lyon County
- State
- Nevada
- Operational date
- May 2015
- Balancing authority
- NEVP
Ft. Churchill PV is a 19.9 MW solar power plant in Yerington, Nevada. Operated by Sierra Pacific Power Co, it has been operating since 2015. The facility is located in Lyon County, within the NEVP balancing authority.
Loading map…
Nearby solar plants in Nevada
Gemini Solar Hybrid
Solar · Unincorporated, Nevada · Operating
Sierra Solar Hybrid
Solar · Fernley, Nevada · Under construction
Arida Solar (Hybrid)
Solar · Laughlin, Nevada · Planned
Bonanza Solar and Storage Project
Solar · Unincorporated Clark, Nevada · Under construction
Rough Hat
Solar · Pahrump, Nevada · Under construction
Source: U.S. Energy Information Administration (EIA-860M)