Castle Solar, LLC
Huntington, Utah
- Capacity
- 40 MW
- Status
- Operating
- Fuel
- Solar
- Technology
- Solar Photovoltaic
- Operator
- Castle Solar, LLC
- City
- Huntington
- County
- Emery County
- State
- Utah
- Operational date
- April 2024
- Balancing authority
- PACE
Castle Solar, LLC is a 40 MW solar power plant in Huntington, Utah. Operated by Castle Solar, LLC, it has been operating since 2024. The facility is located in Emery County, within the PACE balancing authority.
Loading map…
Nearby solar plants in Utah
Source: U.S. Energy Information Administration (EIA-860M)