West Camp Wind Farm
Arizona
- Capacity
- 500 MW
- Status
- Operating
- Fuel
- Wind
- Technology
- Onshore Wind Turbine
- Operator
- AES Clean Energy
- County
- Navajo County
- State
- Arizona
- Operational date
- April 2026
- Balancing authority
- AZPS
West Camp Wind Farm is a 500 MW wind power plant in Arizona. Operated by AES Clean Energy, it has been operating since 2026. The facility is located in Navajo County, within the AZPS balancing authority.
Loading map…
Nearby wind plants in Arizona
Mohave County Wind Farm
Wind · Willow Beach, Arizona · Operating
Chevelon Butte Wind Farm
Wind · Winslow, Arizona · Operating
Chevelon Butte Phase 2
Wind · Winslow, Arizona · Operating
Babbitt Ranch Energy Center
Wind · Flagstaff, Arizona · Operating
Perrin Ranch Wind LLC
Wind · Williams, Arizona · Operating
Source: U.S. Energy Information Administration (EIA-860M)