Wanapum
Beverly, Washington
- Capacity
- 2,258 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- PUD No 2 of Grant County - (WA)
- City
- Beverly
- County
- Grant County
- State
- Washington
- Operational date
- April 2011
- Balancing authority
- GCPD
Wanapum is a 2,258 MW hydroelectric power plant in Beverly, Washington. Operated by PUD No 2 of Grant County - (WA), it has been operating since 2011. The facility is located in Grant County, within the GCPD balancing authority.
Loading map…
Nearby hydroelectric plants in Washington
Grand Coulee
Hydroelectric · Grand Coulee, Washington · Operating
Chief Joseph
Hydroelectric · Bridgeport, Washington · Operating
Rocky Reach
Hydroelectric · Wenatchee, Washington · Operating
Boundary
Hydroelectric · Metaline, Washington · Operating
Priest Rapids
Hydroelectric · Mattawa, Washington · Operating
Source: U.S. Energy Information Administration (EIA-860M)