Boundary
Metaline, Washington
- Capacity
- 1,160 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- City of Seattle - (WA)
- City
- Metaline
- County
- Pend Oreille County
- State
- Washington
- Operational date
- August 1967
- Balancing authority
- SCL
Boundary is a 1,160 MW hydroelectric power plant in Metaline, Washington. Operated by City of Seattle - (WA), it has been operating since 1967. The facility is located in Pend Oreille County, within the SCL balancing authority.
Loading map…
Nearby hydroelectric plants in Washington
Grand Coulee
Hydroelectric · Grand Coulee, Washington · Operating
Chief Joseph
Hydroelectric · Bridgeport, Washington · Operating
Wanapum
Hydroelectric · Beverly, Washington · Operating
Rocky Reach
Hydroelectric · Wenatchee, Washington · Operating
Priest Rapids
Hydroelectric · Mattawa, Washington · Operating
Source: U.S. Energy Information Administration (EIA-860M)