Long Lake
Ford, Washington
- Capacity
- 70 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- Avista Corp
- City
- Ford
- County
- Lincoln County
- State
- Washington
- Operational date
- October 1915
- Balancing authority
- AVA
Long Lake is a 70 MW hydroelectric power plant in Ford, Washington. Operated by Avista Corp, it has been operating since 1915. The facility is located in Lincoln County, within the AVA balancing authority.
Loading map…
Nearby hydroelectric plants in Washington
Grand Coulee
Hydroelectric · Grand Coulee, Washington · Operating
Chief Joseph
Hydroelectric · Bridgeport, Washington · Operating
Wanapum
Hydroelectric · Beverly, Washington · Operating
Rocky Reach
Hydroelectric · Wenatchee, Washington · Operating
Boundary
Hydroelectric · Metaline, Washington · Operating
Source: U.S. Energy Information Administration (EIA-860M)