Tieton Dam Hydro Electric Project
Rimrock, Washington
- Capacity
- 13.8 MW
- Status
- Operating
- Fuel
- Hydroelectric
- Technology
- Conventional Hydroelectric
- Operator
- City of Burbank Water and Power - (CA)
- City
- Rimrock
- County
- Yakima County
- State
- Washington
- Operational date
- September 2006
- Balancing authority
- PACW
Tieton Dam Hydro Electric Project is a 13.8 MW hydroelectric power plant in Rimrock, Washington. Operated by City of Burbank Water and Power - (CA), it has been operating since 2006. The facility is located in Yakima County, within the PACW balancing authority.
Loading map…
Nearby hydroelectric plants in Washington
Grand Coulee
Hydroelectric · Grand Coulee, Washington · Operating
Chief Joseph
Hydroelectric · Bridgeport, Washington · Operating
Wanapum
Hydroelectric · Beverly, Washington · Operating
Rocky Reach
Hydroelectric · Wenatchee, Washington · Operating
Boundary
Hydroelectric · Metaline, Washington · Operating
Source: U.S. Energy Information Administration (EIA-860M)